Resources
Installation
GROSTILE locks dry. Sweep the slab, start from a straight wall or a chalk line, and tap the T-joints home. No adhesive, no grind-and-pour, no cure time.
A competent facilities team can cover a bay after hours. For large halls we can walk through layout, expansion gaps, and color zones before the first carton is opened.
If a tile is damaged later, lift that module. The rest of the floor stays in place.